Hammerhead Battery Connection
Installation of 3” FlexPipe and a 6” & 8” FlexSteel line
ITS performed turnkey installation via plowing of a 3” FlexPipe and 6” & 8” FlexSteel lines for a battery connection. This work included, stringing the pipe, swedging and crimping the FlexPipe & FlexSteel fittings, Horizontal Directional Drilling, plowing all three pipelines to a depth of cover of 6 feet, Right-of-Way clean up, building facility steel and hydrotesting. ITS performed some of the work on a narrow 10m Right-of-Way made possible by using the FOECK SpiderPlow equipment.